SESB Pilot Project was a joint testing project recommended by KETTHA (The Ministry of Energy, Green Technology and Water) to test the performance and emission of SESB diesel power generation in 2015. This project complies to SESB letter of acceptance (Ref: SESB/JSTP/004/25/3). The standard operating procedure (SOP) was implemented with qualified third Party Emission testing and Fuel Quality Lab Test to provide scientific evidence for a professional evaluation.
Total Project Cost of the project is RM75,000.00 (RM Seventy Five Thousand only) and it is undertaken by Exorin to prove to SESB and MESTECC Exorin technologies can effectively increase the proposed SESB diesel generator Productivity and Profitability as well as reduced the emission of the generator.
In conclusion, Exorin Technologies has improved performance on SESB diesel generation, with increased energy efficiency, reduced specific fuel consumption and maintain at low emission. An Return of Investment (ROI) based on SJ Ranau 6 months performance after treatment shows 334% return or is generated. SESB monthly report released into the environment. These results below if applied on SESB entire fleet will have an impact on SESB fiscal year end. The Energy Efficiency has increased up to 5% on the first test (2 weeks) and up to 11.8% on the second test (2 months). Fuel efficiency has also improved from up to 1.6% to 3.8% respectively. The third Party Emission test result has found a significant reduction on overall emission such as hydrocarbon (HC), carbon monoxide (CO), nitrogen oxide (NOx), and black carbon. Among them, the maximum reduction is HC which is about 95%. The diesel fuel analysis results indicate that the fuel system is free from massive contaminants such as metal debris, wax and water sediment. Fuel quality and water contents in the fuel system are follows ASTM standard. The enormous increase of diesel fuel flow is detected during test, which indicates the clean fuel system. It also enhances the performance of effective cooling as well as reduces the stress and the engine operating temperature. It is also found that the generator performance is quite impressive after six months of treatment. A new peak performance is created and maintained at that level throughout its six-month treatment cycle and the Return-on-Investment (ROI) is about 314% per year.
The Return-on-Investment (ROI) is calculated for the treatment of EXORIN products. The cost of treatment was RM37,516.00/ year (RM Thirty Seven Thousand Five Hundred and Sixteen only) and the net saving was RM140,316.00/year (RM One Hundred Forty Thousand Three Hundred Sixteen only) which is about 314% of ROI. From the above, it can be concluded that the EXORIN technology which is a Malaysian technology has very high potential value to drive the market place towards a low carbon economy. Together we make a difference.